May 6, 2020 |
Loan No. and Title: |
Loan 3285-UZB: Northwest Region Transmission Line Project |
Bid No. |
ICB/EPC-NEGU/001-L507- Engineering, Procurement and Construction, 500kV Single Circuit Transmission Line from 500 kV “Guzar” substation (Uzbekistan) to existing 500kV “Regar” substation |
Contract No. and Title: |
ICB/EPC-NEGU/001-L507: Engineering, Procurement and Construction, 500kV Single Circuit Transmission Line from 500 kV “Guzar” substation (Uzbekistan) to existing 500kV “Regar” substation |
Deadline for Submission of Bids: |
June 17, 2020, 10:00 (Tashkent time), Wednesday |
IFB. No. |
ICB/EPC-NEGU/001-L507 |
1. Republic of Uzbekistan has received financing from the Asian Development Bank (ADB) towards the cost of the “Construction, 500kV Single Circuit Transmissionу Line from 500 kV “Guzar” substation (Uzbekistan) to existing 500kV “Regar” substation” Project.
2. Joint Stock Company (JSC) “National Electric Networks of Uzbekistan” invites sealed bids from eligible bidders for engineering, procurement and construction 500kV Single Circuit Transmission Line from 500 kV “Guzar” substation (Uzbekistan) to existing 500kV “Regar” substation (approx. 63.5km), as detailed and specified in the Bidding Document (“the Contract”).
3. International competitive bidding will be conducted in accordance with ADB’s Single-Stage, One-Envelope procedure and is open to all bidders, from ADB eligible countries.
4. The Works under the Contract shall be completed within 12 months from the date of contract effectiveness
5. The Initial Environmental Examination (IEE) and Environmental Management Plan (EMP) for this project are not included in the bidding document at this time, and will be issued to bidders as soon as these become available, and will form part of the bidding document. Bidders’ proposals must incorporate the mandatory measures indicated in the IEE and EMP.
Only eligible Bidders with the following key qualifications should participate in this bidding:
i) Submission of audited financial statements or, if not required by the law of the Bidder’s country, other financial statements acceptable to the Employer, for the last three (3) years, 2017, 2018 and 2019, to demonstrate the current soundness of the Bidder’s financial position. As a minimum, the Bidder’s net worth for the last year calculated as the difference between total assets and total liabilities should be positive.
ii) Minimum average annual turnover of $ 50 000 000 (fifty millions) calculated as total certified payments received for contracts in progress or completed, within the last three (3) years: 2017, 2018 and 2019.
iii) Participation in at least one contract that has been successfully or substantially completed within the last five (5) years and that is similar to the proposed contract, where the value of the Bidder’s participation exceeds $20 mln. USD.
iv) Procurement of high-voltage transmission line not less than 700 units insulators, not less than 300 tons conductors, not less than 150 units steel towers, as specified in the Bidding Document
v) Experience in tower installation 220/500 kV transmission line (TL) no less than 300 units and experience in cable, conductors and OPGW tensioning for 220/500 kV transmission line no less than 120 km
The Bid shall be submitted in a separate envelope with its corresponding bid security authorized by local bank in Uzbekistan.
6. To obtain further information and requests that needs clarifications on the Bidding Documents, bidders should contact:
Mr. Artikov Sobirjon, First Deputy Chairman of the Board,
JSC “National Electric Grid of Uzbekistan”
Street address: 42, Osiyo str.
Floor/Room number: 410 (4th floor)
City: Tashkent
ZIP code: 100 084
Country: Uzbekistan
Telephone: + 99871 208 56 26
Fax: + 99871 208 56 26
E-mail address: northwest220g@gmail.com
7. To obtain the Bidding Documents at no cost, eligible bidders should
8. Deliver your bid:
JSC “National Electric Grid of Uzbekistan” will not be responsible for any costs or expenses incurred by bidders in connection with the preparation or delivery of bids.