Tenders
Construction of the 500/220 kV Muruntau transmission substation and of 220 kV line in the size of 500 kV from the Navoi TPP to the 220 kV 'Besopan' switching station
  • 05.02.2021
  • 1773

  Construction of 500/220 kV Muruntau Substation with two new autotransformers of 3*167 MVA each and of approximately 177 km 220 kV line in the size of 500 kV from the Navoi TPP to the 220 kV 'Besopan' switching station

download PDF file

Link:  https://ecepp.ebrd.com/respond/AZYA73VC8J

Anvar Kasimkhodjaev
+998 71  236-68-81.

JSC «National Electric Grid of Uzbekistan»
42 Osiyo St.  Tashkent, 100084, Uzbekistan
uzbekistonmet.uz

pmu.muruntau@gmail.com

>